Disaster Recovery Testing on December 27 and 30, 2010

UPDATE: Date postponed until Tuesday, 12/28/2010 at 5:00PM due to weather.

Over the holiday break, the Department of Information Technology will have two service interruptions which are required for our disaster recovery testing. The first is on Monday, December 27, 2010 and the second is on Thursday, December 30, 2010.  Work will begin at 5 pm on both days.

During this time, we will be performing a full test of our disaster recovery implementation simulating an emergency situation. We expect to have all services back up and running by midnight.

All HSPH mission critical servers and data are replicated at a remote site.  In case of an emergency at HSPH that affects our server rooms (i.e., flood), we are able to switch to the remote location restoring core services to the community as quickly as possible.  Examples of core services include email, file sharing, and web services. The following services will be unavailable for the duration of the switch-over on December 27th beginning at 5 pm:

On Thursday, December 30th from 5PM to 12AM, we will have the final service interruption in order to return to normal operations back at HSPH.  We expect to have all services up and running by midnight.  The following services will be unavailable for the duration of the switch-back on December 30th: